Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
11/16/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/16/23: install mud ring for Ufer, support duct with straps, low air test on gas pipe, block hole in garage shear wall, duct not run to west bedroom/den, run bathroom exhaust duct over the top of ABS, jump duct missing in east bedroom, block ends of register box. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT NEXT INSPECTION.
11/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/16/23: install mud ring for Ufer, support duct with straps, low air test on gas pipe, block hole in garage shear wall, duct not run to west bedroom/den, run bathroom exhaust duct over the top of ABS, jump duct missing in east bedroom, block ends of register box. INSPECTION STOPPED. MORE ITEMS MAYBE ADDED AT NEXT INSPECTION.

11/22/23: support all duct with straps, relocate hall fresh air intake register, duct interferes with 30" required clear head space at shuttle opening.
12/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/6/23:intermediate approved
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed passed per previous inspector