Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
Permit Number - TC-MDP-0523-01019
Inspection Description - BULD - Electrical Clearance
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/06/2023 | BULD - Electrical Clearance | Not Ready | 11/6/23: not ready | |
11/14/2023 | BULD - Electrical Clearance | Re-inspection required | 11/14/23: seal all penetrations through top plate throughout, ufer needs to be properly fastened, wire size in bedrooms (2,3&1) not per plan (12AWG required per plans), pex must be 12'' from can lights, gas piping in laundry room needs to be properly secured, kitchen hood vent not installed, block registers on 3 sides, exhaust fan in attic missing, wire not made up in master closet, refrigerant lines need to be brazed into air handler, all penetrations going through vapor barrier need to be sealed, 3" Clean out missing at master bathroom per plan, missing Ev charger per plans. Dryer box not installed. | |
11/21/2023 | BULD - Electrical Clearance | Canceled | Cancelled per John. | |
11/28/2023 | BULD - Electrical Clearance | Re-inspection required (with fee) | Properly install GEC to uffer, seal all penetrations through top plate throughout, wire size in bedrooms (2,3&1) not per plan (12AWG required per plans), secure gas line, stopped inspection. Walk house to check for code compliance before calling for inspection. | |
11/30/2023 | BULD - Electrical Clearance | Passed |