Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0523-01019
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/14/23: seal all penetrations through top plate throughout, ufer needs to be properly fastened, wire size in bedrooms (2,3&1) not per plan (12AWG required per plans), pex must be 12'' from can lights, gas piping in laundry room needs to be properly secured, kitchen hood vent not installed, block registers on 3 sides, exhaust fan in attic missing, wire not made up in master closet, refrigerant lines need to be brazed into air handler, all penetrations going through vapor barrier need to be sealed, 3" Clean out missing at master bathroom per plan, missing Ev charger per plans. Dryer box not installed. | |
11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
11/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | Properly install GEC to uffer, seal all penetrations through top plate throughout, wire size in bedrooms (2,3&1) not per plan (12AWG required per plans), secure gas line, shear wall hold down not installed, stopped inspection. Walk house to check for code compliance before calling for inspection. | |
11/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | Wire size in bedrooms (2,3&1) not per plan (12AWG required per plans), gas piping in laundry room needs to be properly secured, kitchen hood vent not installed, exhaust fan in attic missing, refrigerant lines need to be brazed into air handler, 3" Clean out missing at master bathroom per plan, missing Ev charger per plans. Dryer box not installed, properly secure low voltage box in master closet. | |
12/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | gas piping in laundry room needs to be properly secured, kitchen hood vent not installed, exhaust fan in attic missing, Dryer box not installed, properly secure low voltage box in master closet. | |
12/15/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
12/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |