Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Interior Shear Bracing
Permit Number - TC-MDP-0523-01015
Inspection Description - COT - RSBU - Interior Shear Bracing
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/16/2024 | COT - RSBU - Interior Shear Bracing | Re-inspection required | 1/16/24: north wall in garage nailing not per schedule (studs are spaced 16" o.c, over span on nailing), nail schedule in no bedroom closet not per plan, nailing not per schedule throughout. No plans on site. | |
01/18/2024 | COT - RSBU - Interior Shear Bracing | Passed |