Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2023 | COT - RSPL - Rough Soil | Re-inspection required | Not ready. Shower line is calling for 2" and 1" 1/2 is installed. Plumbing not per plan. 10/2/2023 | |
| 10/03/2023 | COT - RSPL - Rough Soil | Passed | Not ready. Shower line is calling for 2" and 1" 1/2 is installed. Plumbing not per plan. 10/2/2023 10/3/23: corrections made |