Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
11/28/2023 BULD - Electrical Clearance Re-inspection required Uffer installed incorrectly, garage lights not per plans according to E1. Incorrect wire sizes. Garage lights also connecting to hallway and den. Not per plans, seal penetration at vapor barrier right side of garage, pex lines within 12” of can lights must be insulated, water lines not connected/completed, DWV not under test, showers/tubs not under test, secure copper line in master bathroom shower, incorrect wire sizes for outside receptacles. Not per E1 plan. Stopped inspection. Check house for code compliance before calling for inspection.
12/01/2023 BULD - Electrical Clearance Passed