Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | ENGR Engineering Final | Not Ready | No grade cert. Both side yards holding water. Sewer ring in driveway not completed. No gate. |
|
| 04/24/2024 | ENGR Engineering Final | Passed | Everything is good to go for a full CO |