Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | ENGR Engineering Final | Not Ready | No grade cert. Rear yard holding water. Sewer clean outs need to be cut down and finished. No gate. Low voltage pedestal in front of yard damaged. |
|
| 04/15/2024 | ENGR Engineering Final | Passed | Clean outs still need to be cut down |