Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
11/13/2025 ENGR Engineering Final Not Ready Reinstall paver pathway. Cannot exceed 5% running slope, entryways non-compliant with inclusive home design ordinance.
11/18/2025 ENGR Engineering Final Not Ready Accessible Route per inclusive home design ordinance will need re-inspection after stem wall correction.
12/03/2025 ENGR Engineering Final Not Ready 12/3/25 Not ready.
Accessible route needs to be at grade with finish floor at entryway. Cross-slope cannot exceed 2%, running slope cannot exceed 5%. Connect accessible route from the driveway to the entryways.
12/15/2025 ENGR Engineering Final Passed