Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-MDP-0523-00961

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
11/28/2023 ENGR Engineering Final Partial Pass There’s still forms set at the side entrance on the south side of the building. There is no weep holes in the backyard for the water to drain.
12/04/2023 ENGR Engineering Final Passed