Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 8-26-26 Other items were corrected while on site* fresh air intake is required to be 10 feet away from DWV* fix any tears and flex ductwork throughout* also provide approved means of straps 4 feet from opening at 4 foot intervals for flex duck throughout. Seeing that all items are overhead OK to insulate partial pass pending overhead |
|
| 08/28/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8-28-26 all items have been corrected. OK to proceed. |