Inspection History Details
Inspection Status: Canceled
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2026 | ENGR Engineering Final | Canceled | ||
| 09/23/2026 | ENGR Engineering Final | Not Ready | Outstanding conditions need to be approved prior to final. Commercial permit final for sales office can be called in Accessible Route will need to have post and cable fencing at both ends of the rear sidewalk removed. |
|
| 09/30/2026 | ENGR Engineering Final | Not Ready | Schedule the residential finals when the building is converted back into a residence. | |
| 10/30/2026 | ENGR Engineering Final | Not Ready | Schedule the residential finals when the building is converted back into a SFR. |