Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2024 |
COT - RSPL - Plumbing Final |
|
Re-inspection required |
8/22/24: post tension tag required at hose bib, insulation required on exterior hose bib, 3" clearance required at A/C condenser form grade, properly secure electrical whip at A/C condenser, anti-corrosion compound required at aluminum conductors, no power at A/C unit, no plans at time of inspection, A.V.V must be above flood rim level, secure NM cable 12" from box at attic receptacle, clean out missing at kitchen sink. |
| 08/27/2024 |
COT - RSPL - Plumbing Final |
|
Passed |
8/27/2024 corrections have been made |