Inspection Status: Passed
Inspection History: COT - RSBU - Roof Nailing
| Date |
Description |
Inspector |
Results |
Comments |
| 04/15/2025 |
COT - RSBU - Roof Nailing |
|
Passed |
passed |
| 09/18/2024 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
9/18/24: loose panels |
| 11/15/2024 |
COT - RSBU - Roof Nailing |
|
Re-inspection required |
11-15-24, roof is weighed down with tiles. I am unable to verify roof nailing. Therefore, provide a letter stating that roof nailing was nailed per approved plans or remove all tiles and reschedule an inspection.Also, pancake box for coach lights at garage are overfilled. Box is rated for 6 cubic inches and it contains 2 14/2 awg wires. |