Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | ENGR Engineering Final | Not Ready | Post tension slab cable not cut off Clean outs need to be cut down and cover placed Sewer cover missing |
|
| 02/14/2025 | ENGR Engineering Final | Not Ready | ||
| 02/25/2025 | ENGR Engineering Final | Passed |