Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2024 |
COT - RSBU - Exterior/Interior Clips/Sheathing/Framing |
|
Passed |
All exterior and interior plywood shear walls are properly nailed to studs. Shear wall hold downs are properly secured to concrete floor and nailed off. All bottom plates are secured to the concrete floor with shot pins, masa clips, or red head bolts. Okay to proceed with rough-in of plumbing, electrical, and mechanical. |