Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
Permit Number - TC-MDP-0424-00396
Inspection Description - RSBU - Building Progress
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/28/2024 | RSBU - Building Progress | Re-inspection required | 10-28-24, seal vapor barrier at garage, properly ground exterior light fixture at garage, gas not under pressure, thermostat wiring near entry to kitchen measured at 58 inches ( max height shall be 54 inches from grade), stopped inspection-additional items requiring correction may be noted. | |
10/29/2024 | RSBU - Building Progress | Re-inspection required | 10-29-24, seal penetrations at garage, seal all staples on vapor barrier throughout, properly attach strap in bedroom 2, missing fire foam at penetrations inside storage room | |
10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, listed items from previous inspections have been corrected. Intermediate inspection approved. Okay to proceed with construction. |