Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Permit Number - TC-MDP-0424-00375

Inspection Description - COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Inspection Status - Passed

Date Description Inspector Results Comments
09/06/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Exterior walls and interior walls are properly secured to concrete floor with masa clips, j-bolts, titan bolts, cut nails, or shot pins. Plywood sheathing is properly secured to studs per plan for shear walls. All masa clips and shear wall hold downs are nailed properly. Okay to proceed with rough-in.