Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Open chase at left and right side of laundry, fix blocking at top of chase above kitchen sink or add nail plate for pex lines, open chase at piping near back porch, nail plate pex line at living room, dwv not fully under test, master bathroom can light not installed. | |
| 09/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Open chase at left and right side of laundry, fix blocking at top of chase above kitchen sink or add nail plate for pex lines, open chase at piping near back porch, nail plate pex line at living room, dwv not fully under test, master bathroom can light not installed. 9/1/23: Open chase at left and right side of laundry, fix blocking at top of chase above kitchen sink or add nail plate for pex lines, open chase at piping near back porch, nail plate pex line at living room, dwv not fully under test, master bathroom can light not installed, all flex duct in upstairs needs to be strapped (hanging below trusses in multiple locations) |
|
| 09/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |