Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/01/2024 |
ENGR Engineering Final
|
|
Not Ready |
sewer pipe needs cutting down to grade, south screen wall not present and associated soils on subject property, construction debris on east porch, and gate wall not complete (rebar present). |
| 02/05/2024 |
ENGR Engineering Final
|
|
Not Ready |
construction material on front of property and south screen wall not complete |
| 07/05/2024 |
ENGR Engineering Final
|
|
Passed |
|