Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0423-00852
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/14/23: seal all penetrations through top plate throughout,properly secure uffer ground, garage lights needs to be on a circuit with only garage and be 12AWG per plan (currently tied in with bedroom 3, wiring in laundry room not per plan calls for 12AWG, wiring for stove top not installed, wiring in bedroom 1 not per plan, proper secure wall at laundry room, refrigerant lines not brazed to air handler. Seal vapor barrier in attic front of house, EV charger missing per plan. | |
11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
11/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | Properly install GEC to uffer, seal all penetrations through top plate throughout, garage lights needs to be on a circuit with only garage and be 12AWG per plan (currently tied in with bedroom 3, proper secure wall at laundry room, install HTT hold down for shear wall. Walk house to check for code compliance before calling for inspection. | |
11/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | Garage lights needs to be on a circuit with only garage and be 12AWG per plan (currently tied in with bedroom 3, wiring in laundry room not per plan calls for 12AWG, wiring for stove top not installed, wiring in bedroom 1 not per plan. Electrical and plumbing not per plans. Proceed at risk. Revise plans to show current layout of electrical and plumbing and provide updated plans at final. | |
12/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |