Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2023 | ENGR Engineering Final | Not Ready | 1) cut down clean outs to grade 2) no gate and gate wall on left side is out of plumb |
|
| 12/13/2023 | ENGR Engineering Final | Passed | Clean outs and gate |