Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7/12/23: Bond ufer and rebar together with clamp, seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, dwv not under test, insulate pex that is within 12" of can lights, secondary condensate line double trapped, staple wires at bedroom 2. |
| 07/13/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7/13/23: Bond ufer and rebar together with clamp, seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, dwv not under test, insulate pex that is within 12" of can lights, secondary condensate line double trapped, staple wires at bedroom 2. |
| 07/14/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
7/14/23: Seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, secondary condensate line double trapped, staple wires at bedroom 2. Re-inspection fee required. |
| 07/18/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|