Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7/12/23: Bond ufer and rebar together with clamp, seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, dwv not under test, insulate pex that is within 12" of can lights, secondary condensate line double trapped, staple wires at bedroom 2. |
| 07/13/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
7/13/23: Bond ufer and rebar together with clamp, seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, dwv not under test, insulate pex that is within 12" of can lights, secondary condensate line double trapped, staple wires at bedroom 2. |
| 07/14/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required (with fee) |
7/14/23: Seal penetration going through top plate at garage, nail plate stud at back end of garage and at gathering room, secondary condensate line double trapped, staple wires at bedroom 2. Re-inspection fee required. |
| 07/18/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
|