Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 09/18/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
9-18-26 Bang plates required at all marked locations when hole through stud is less than one and a quarter inch away from face of stud* fire blocking required at Marked locations, exterior penetrations, and in top plate penetrations* cold waterline, running through garage is required to be insulated. All waterlines in unconditioned spaces are required to be insulated. Reinspect is required. |
| 09/21/2026 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
9-21-26 all items have been corrected. OK to proceed. |