Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Partial Pass | 7/28/25 Partial pass; provide engineer letter for FG3 floor Truss. Stud damaged with over nailing. |
|
| 08/15/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8.15.25 Corrections made as required |