Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/16/2025 |
ENGR Engineering Final
|
|
Not Ready |
Lot does not drain properly. South side of the house has a 2" elevation increase from the gate to the front door, needs to decrease. Signs of standing water are evident. |
| 10/17/2025 |
ENGR Engineering Final
|
|
Passed |
Site is complete in accordance with approved plans. Engineering is good for CofO. |