Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2025 |
RSBU - Building Progress |
|
Re-inspection required |
6-5-25: entire system must be tested by means of a static water test to 5' above highest fitting. Have plumbers check for possible leak and reschedule when ready. |
| 06/06/2025 |
RSBU - Building Progress |
|
Partial Pass |
6/6/25: plumbing underground and HCS connection per approved plans. System was under 5' static pressure, ok to backfill. |
| 10/06/2025 |
RSBU - Building Progress |
|
Passed |
|