Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 11/19/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
All wires at ceiling height at electrical panel are chafing on nail stop, gas pipe is not supported on main run going north and south in garage, no nails at top of being support posts in garage two spots, no water on DWV, Sweet from upstairs restroom and ceiling is not supported no support on gas pipe in living room and kitchen east and west run One register box not blocked on three sides in kitchen, ceiling, fan, and living room is not blocked properly, fire foam in two spots going from first floor to second floor, dryer, gas pipe and electrical |
| 11/20/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
All corrections were made. approved. 11/20/2024 |