Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
The login landing page when selecting 'View' is still occurring and is still pending further investigation.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2024 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
6/6/24: reinforcement requires 3" clearance from earth (making contact throughout), PT pocket former not properly installed at garage, exposed cable at PT over the maximum allowable throughout on both ends. Footings must be 12" in depth, |
| 06/07/2024 |
COT - RSBU - Excavation/Rebar/Zoning |
|
Passed |
Corrections were made. Okay for concrete placement. 6/7/2024 |