Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2025 | ENGR Engineering Final | Not Ready | Remove the nursery stake. Cut down and glue the clean out. Drainage between the 2 homes needs to be mounded so as to keep drainage off of neighbors lot. |
|
| 01/09/2025 | ENGR Engineering Final | Passed | CO Ready |