Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Lath incomplete. Water lines and DWV not on test. Add nail plates to both electrical and plumbing lines that are less than an 1 1/4". Light in kitchen ceiling not made up. Remove electrical lines from gusset plates. Shower pan and tub not on test. Seal all exterior and penetrations through top plates. Missing receptacle in bedroom 4 under switch. Add receptacle in both 2 and 3 bedrooms. Wall greater than 2'. 10/16/2024 | |
| 10/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 10-21-24, cancelled per Phil. | |
| 10/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Lath incomplete. Water lines and DWV not on test. Add nail plates to both electrical and plumbing lines that are less than an 1 1/4". Light in kitchen ceiling not made up. Remove electrical lines from gusset plates. Shower pan and tub not on test. Seal all exterior and penetrations through top plates. Missing receptacle in bedroom 4 under switch. Add receptacle in both 2 and 3 bedrooms. Wall greater than 2'. 10/16/2024 10-23-24, provide set of approved plans. Noted upstairs DWV has a water leak coming from lavatory located in north wall. |
|
| 10/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-25-24, listed items from previous inspection corrected. Intermediates approved, okay to proceed with build. |