Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | ENGR Engineering Final | Partial Pass | Contractor needs to finish the landscaping unit at this location | |
| 11/22/2024 | ENGR Engineering Final | Passed | CO Ready |