Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2025 |
RSBU - Building Progress |
|
Re-inspection required |
|
| 04/01/2025 |
RSBU - Building Progress |
|
Passed |
|
| 08/15/2024 |
RSBU - Building Progress |
|
Partial Pass |
8/15/24: screen wall footing reinforcement between unit per plan ok to proceed. |
| 08/26/2024 |
RSBU - Building Progress |
|
Partial Pass |
8/26/24: first lift at 4’ at 8”CMU screen wall passed ok to grout. ok to proceed |
| 08/30/2024 |
RSBU - Building Progress |
|
Partial Pass |
8/30/24: 8” CMU wall at back porch reinforcement per plan ok to grout, |
| 09/06/2024 |
RSBU - Building Progress |
|
Partial Pass |
9/6/24: 1/2” GYP BOARD at demising wall fastened per schedule ok to proceed with fire wall. |
| 11/19/2024 |
RSBU - Building Progress |
|
Re-inspection required |
11/19/24: 5D screws required at shear walls. fasteners missing throughout at field and edges of gypsum board, properly secure shower mixing valves in master bedroom, seal chase at master bathroom behind shower wall, |