Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0324-00268
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 10/15/24: canceled by Manny | |
10/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/15/24: canceled by Manny 10/21/24: WEST UNIT:nail plates required throughout where (plumbing, electrical, mechanical) come within 1 1/4" from face of stud, 18" of copper required before transitioning to pex, plans call for 12AWG at master bedroom (14AWG installed), showers not under test, seal sleeves under slab at kitchen, electrical and plumbing cannot run in same underground sleeves, smoke detector required per code outside of master bedroom, FHA 5x18 required at refrigeration lines, properly secure low voltage cable in wall, plans call for 21 circuits only 17 at panel at time of inspection. Wire size not per plan throughout, properly secure flex.STOPPED INSPECTION MORE ITEMS MAY BE ADDED. East unit not walked. |
|
10/28/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Shower pans need to be on test. Remove all electrical and plumbing lines off of gusset plates. Dryer vent needs to have clearance from combustibles. Require fix for Over notched studs in laundry room. Seal sleeves for both plumbing and electrical lines. Provide FHA plate to refrigerant lines. Tape electrical line that has been damaged by nail while pulled. 10/28/2024 | |
11/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |