Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2023 | ENGR Engineering Final | Not Ready | 1) Clean-out in driveway should be cut flush and a traffic rated cover used 2) Remove nursery stake from tree in front yard. 3) Clean-out in front yard should be cut flush with landscape. 4) remove trash from drainage swale right side of house. |