Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2024 | ENGR Engineering Final | Not Ready | DG pile in driveway Nursery stakes must be removed |
|
| 08/19/2024 | ENGR Engineering Final | Passed |