Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0323-00685
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Ufer not connected, nail plate needed at top plate of refrigerators hot water service at back side, complete wiring to right side of door in master bedroom, support 4-gang box on both sides in kitchen, wire staple needed in bedroom behind kitchen, fix tears in vapor barrier throughout, add more water to shower pan. | |
08/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Ufer not connected, nail plate needed at top plate of refrigerators hot water service at back side, complete wiring to right side of door in master bedroom, support 4-gang box on both sides in kitchen, wire staple needed in bedroom behind kitchen, fix tears in vapor barrier throughout, add more water to shower pan. WALK HOUSE BEFORE CALLING INSPECTION. | |
08/31/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | support 4-gang box on both sides in kitchen, add water to shower pan, |