Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line and under a water pressure test with no leaks present. Okay to shade pipes and backfill trenches. |