Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | BULD - Electrical Clearance | Not Ready | Replace meter bank. 7/20/2026 | |
| 08/05/2026 | BULD - Electrical Clearance | Re-inspection required | 8-5-26: seal vapor barrier at east /west wall garage, add fha plate at top plate at kitchen exhausts fans, seal vapor barrier at west wall adjacent to patio doors, seal horizontal penetrations at entryway ( conditioned to unconditioned space), add supports to flex at 4' intervals throughout, add bank plates at marked locations, properly support DWV 1st floor bathroom, seal penetrations between 1st & 2nd floor decking, replace meter bank (paint on bus bars), Stopped inspection-additional items may be noted-2nd floor not walked. |