Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-0226-00056

Parcel: 141155800


Addresses:

10014 E LEBARON

Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
07/20/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready Dwv not on test. Pex not under test. Provide supports at every 4' at duct work. Tubs not under test. Stopped inspection. Other items may vary. 7/20/2026
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 8-5-26: seal vapor barrier at east
/west wall garage, add fha plate at top plate at kitchen exhausts fans, seal vapor barrier at west wall adjacent to patio doors, seal horizontal penetrations at entryway ( conditioned to unconditioned space), add supports to flex at 4' intervals throughout, add bank plates at marked locations, properly support DWV 1st floor bathroom, seal penetrations between 1st & 2nd floor decking, replace meter bank (paint on bus bars), Stopped inspection-additional items may be noted-2nd floor not walked.