Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Dwv not on test. Pex not under test. Provide supports at every 4' at duct work. Tubs not under test. Stopped inspection. Other items may vary. 7/20/2026 | |
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8-5-26: seal vapor barrier at east /west wall garage, add fha plate at top plate at kitchen exhausts fans, seal vapor barrier at west wall adjacent to patio doors, seal horizontal penetrations at entryway ( conditioned to unconditioned space), add supports to flex at 4' intervals throughout, add bank plates at marked locations, properly support DWV 1st floor bathroom, seal penetrations between 1st & 2nd floor decking, replace meter bank (paint on bus bars), Stopped inspection-additional items may be noted-2nd floor not walked. |
||
| 08/21/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 8.21.26 1. Kinked hvac flex in kitchen just above pony wall. 2. Kinked/smakshed 12" flex upstairs in master bedroom. |
|
| 08/28/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8-28-26 all items have been corrected. OK to proceed. |