Inspection History Details
Inspection Status: Failed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | ENGR Engineering Final | Failed | Sewer clean out collars need to be glued in place. Drainage on the right side of the home will not continuously flow as there is a hump in the garage in front of the wall. |
|
| 08/18/2025 | ENGR Engineering Final | Passed |