Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | RSBU - Building Final | Re-inspection required | Wrap condensation lines in UV tape. Secure seal tight whip. Smoke detector is called to be on a dedicated circuit. Missing lights in bathrooms and garage. Provide post tension tag at water line. 8/19/2024 | |
| 08/23/2024 | RSBU - Building Final | Not Ready | Wrap condensation lines in UV tape. Secure seal tight whip. Smoke detector is called to be on a dedicated circuit. Missing lights in bathrooms and garage. Provide post tension tag at water line. 8/19/2024 8/23/24: not ready |
|
| 08/27/2024 | RSBU - Building Final | Canceled | Canceled per contractor. 8/27/2024 | |
| 08/28/2024 | RSBU - Building Final | Passed |