Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSME - Mechanical Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2024 | COT - RSME - Mechanical Final | Re-inspection required | 8/22/24: panel schedule not complete, condensate drains not properly installed must have 90 degree and terminate 6" above grade, seal all penetrations through stucco, properly install gasket at water heater vent, cut gray water to grade, A/C condenser being over amped, Post-tension tag missing at hose bib, cut clean out to grade, cover plates missing on exterior, no plans on site, provide proper ladder for attic access, engineering final not passed. | |
| 08/23/2024 | COT - RSME - Mechanical Final | Re-inspection required | 8/22/24: panel schedule not complete, condensate drains not properly installed must have 90 degree and terminate 6" above grade, seal all penetrations through stucco, properly install gasket at water heater vent, cut gray water to grade, A/C condenser being over amped, Post-tension tag missing at hose bib, cut clean out to grade, cover plates missing on exterior, no plans on site, provide proper ladder for attic access, engineering final not passed. 8/23/24: A/C unit being over amped all other issues addressed. |
|
| 08/26/2024 | COT - RSME - Mechanical Final | Passed | Corrections were made. 8/26/2024 |