Inspection Status: Canceled
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0224-00251
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Canceled
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Canceled per contractor. 10/1/2024 | |
10/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Canceled per contractor. 10/1/2024 10/2/24: Receptacle at hallway missing, circuits tied in together plans call for 23 circuits only 17 circuits visible at panel. Electrical wiring must be per plans, 12" of clearance required between pex and can lights, gauge for gas piping pressure test is damaged, all penetrations through vapor barrier must be sealed, all wiring must be secured 12" from box. WR receptacle required for electrical clearance. DWV not under test. |
|
10/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Canceled per contractor. 10/1/2024 10/2/24: Receptacle at hallway missing, circuits tied in together plans call for 23 circuits only 17 circuits visible at panel. Electrical wiring must be per plans, 12" of clearance required between pex and can lights, gauge for gas piping pressure test is damaged, all penetrations through vapor barrier must be sealed, all wiring must be secured 12" from box. WR receptacle required for electrical clearance. DWV not under test. 10/10/24: Test gauge at gas piping must be 15psi gauge and be tested to 15psi, 12" clearance required from pex to can light, seal sleeves for underground plumbing and electrical, provide updated electrical drawings, support gas piping midway at vertical runs. |
|
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-24-24-All items listed from previous inspection were corrected to match original plans. Intermediates approved-okay to continue construction. |