Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Progress
Permit Number - TC-MDP-0224-00241
Inspection Description - RSBU - Building Progress
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/04/2024 | RSBU - Building Progress | Re-inspection required | 11-4-24, missing knockout at electrical panel, clean out in front yard must be cut down to grade, A/C breaker undersized for a/c condenser (currently contains a 30 amp breaker for a 35 amp disconnect), provide a set of plans to verify whether shower in master bedroom requires a tempered sliding glass door. | |
11/06/2024 | RSBU - Building Progress | Passed |