Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5/31/24: R-8 flex duct must be installed, VTR missing at kitchen sink, properly seal all penetrations through top plate, seal all penetrations through vapor barrier, properly support flex duct throughout. | |
| 06/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5/31/24: R-8 flex duct must be installed, VTR missing at kitchen sink, properly seal all penetrations through top plate, seal all penetrations through vapor barrier, properly support flex duct throughout. 6/5/24: corrections made. |