Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2023 | ENGR Engineering Final | Not Ready | Landscaping is not completed. Contract are still working on the house. | |
| 12/13/2023 | ENGR Engineering Final | Not Ready | 1) Tree stakes must be in place. 2) Block wall on right side of rear yard must be repaired. 3) Cut down to grade hgt. clean outs so as not to create trip hazards. 4) Remove all paint material. Please insure that all Porta-Jon’s on site are staked down. |
|
| 12/19/2023 | ENGR Engineering Final | Passed |