Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/27/2024 |
RSBU - Building Final |
|
Not Ready |
3/27/24: waiting on engineering final. |
| 04/02/2024 |
RSBU - Building Final |
|
Re-inspection required |
engineering final |
| 04/10/2024 |
RSBU - Building Final |
|
Re-inspection required |
Must pass engineering final. |
| 04/12/2024 |
RSBU - Building Final |
|
Passed |
|