Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2023 | ENGR Engineering Final | Not Ready | 1) dirt pile on lot to the right encroaches on this lot disturbing drainage. 2) 2nd concrete panel from the right in the sidewalk is cracked. 3) cut all clean outs flush with landscaping. 4) ensure back drainage is sufficient. 5) gate is missing. |
|
| 12/07/2023 | ENGR Engineering Final | Passed |