Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2023 | ENGR Engineering Final | Partial Pass | Complete Blockwork and cleanup of construction materials and debris. Provide clean out covers rated for use in a concrete pedestrian pathway, where applicable to prevent damage. Is there a site plan for this project? |
|
| 06/26/2023 | ENGR Engineering Final | Passed | Need to verify that all drainage aspects have been satisfied and that the Floodplain Use Permits are complete. |